top of page

Our service

Piping Thermal Insulation and Cladding

  • Installation of insulation materials for industrial piping systems.

  • Protective cladding to enhance durability and maintain insulation integrity.

Equipment Thermal Insulation and Cladding

  • Insulation for industrial equipment, including turbines, pumps, and exchangers.

  • Cladding services to protect insulation from environmental factors.

Tank Thermal Insulation and Cladding

  • Insulation for storage tanks of various sizes and materials.

  • Protective cladding to maintain product temperature and prevent heat loss.

Boiler Thermal Insulation

  • Insulation services for industrial boilers.

  • Improved energy efficiency and reduced heat loss.

Welding Services

  • Welding services for tanks, piping, and industrial components.

  • Skilled welders available for specialized projects.

 

Projects in Finland

  • Piping Thermal Insulation and Cladding
    Location: Naistenlahti Power Plant, Tampere
    Year: 2022
    Thermal insulation and protective cladding for piping systems.

  • Piping, Equipment, and Tanks Thermal Insulation and Cladding
    Location: Metsä Fibre BTT, Kemi
    Project Duration: October 2022 – December 2023
    Comprehensive insulation and cladding services for industrial piping, equipment, and tanks.

  • Piping Thermal Insulation and Cladding, Boiler Thermal Insulation
    Location: Oulun Energia, Oulu
    Year: 2022
    Thermal insulation of piping systems and boiler components.

  • Boiler Thermal Insulation
    Location: Kuusamon Voimalaitos, Kuusamo
    Year: 2022
    Complete thermal insulation services for industrial boilers.

  • Piping Thermal Insulation and Cladding
    Location: Stora Enso Mill, Imatra
    Year: 2023
    Installation of thermal insulation and cladding for complex piping systems.

  • Boiler Thermal Insulation
    Location: Oulun Energia, Oulu
    Project Duration: May 2023 – October 2023
    Comprehensive boiler insulation services.

  • Piping, Equipment, and Tanks Thermal Insulation and Cladding
    Project: O750 – Stora Enso Oulu Project
    Location: Oulu
    Project Duration: July 2024-March 2025

  • Equipment, Piping Thermal Insulation and Cladding
    Location: Stora Enso Imatra Mill, Imatra
    Project Duration: September 2024 – December 2024

  • Equipment, Piping Thermal Insulation and Cladding
    Location: Stora Enso Enocell, Uimaharju
    Year: 2024

  • Equipment, Piping Thermal Insulation and Cladding
    Location: Kotkamills Absorbex, Kotka
    Year: 2024

  • Equipment, Piping Thermal Insulation and Cladding
    Location: Kuopio Energia, Kuopio
    Year: 2024

  • Equipment, Piping Thermal Insulation and Cladding
    Location: Lieksa-Nevel, Lieksa
    Year: 2024

  • Equipment, Piping Thermal Insulation and Cladding
    Location: Yara Siilinjärvi, Siilinjärvi
    Year: 2024

  • Tanks Welding Jobs, Thermal Insulation and Cladding
    Location: Metsä Wood Äänekosken, Äänekoski
    Year: 2025

Salvelum OÜ Insulation Cladding service

Copyright © 2015 SALVELUM OÜ. All rights reserved.

bottom of page